Specifications: Dam height of 3.5 meters, dam length of 37 meters
Installation date: September 2018
Project profile: The project is a water diversion project for Wuyishan river, lake and reservoir. The design scheme of air shield dam is adopted to ensure the lifting and storage operation of the gate under various harsh working conditions and effectively protect the air bag from the damage of Rolling Stones and floating objects in the river, and also effectively protect the water environment of the river.

